Menu and production style
A coffee shop, bakery, commissary, full-service restaurant, and high-volume kitchen can have very different grease loading and fixture patterns.

Restaurant Grease Trap Planning
Restaurants need grease trap decisions that line up with kitchen layout, menu, fixture count, utility conditions, landlord requirements, and local permitting. Genesis Prime Group helps owners and tenant teams connect those decisions before they become expensive construction problems.

Why Restaurants Should Start Early
A grease interceptor is not just a plumbing accessory. For a restaurant, it can affect the lease budget, available floor area, exterior work, utility routing, construction schedule, inspection sequence, and food-service opening date. A tenant who waits until drawings are nearly complete may discover that the existing device is undersized, inaccessible, unpermitted, damaged, or unsuitable for the proposed menu and fixture load.
Genesis Prime Group approaches restaurant grease trap planning as a coordination problem. The right path may involve evaluating an existing system, planning a replacement, coordinating permit requirements, estimating excavation and restoration impacts, or sizing a new interceptor for the proposed kitchen. The exact scope depends on the project conditions and the authorities having jurisdiction.
For Miami-Dade projects, restaurant operators should also understand the County's FOG program before committing to a space. Miami-Dade describes FOG generators as non-residential facilities that handle, prepare, or process food and may discharge fats, oils, and grease. Genesis uses that official framework as a planning reference, then evaluates the actual project conditions.
Planning Conditions
A coffee shop, bakery, commissary, full-service restaurant, and high-volume kitchen can have very different grease loading and fixture patterns.
Sinks, prep fixtures, floor drains, mop sinks, dish areas, and other equipment must be reviewed for how wastewater reaches the interceptor.
Old tenant spaces may have undocumented piping, abandoned devices, poor access, or site constraints that affect replacement and routing.
Some projects require excavation, interceptor setting, plumbing tie-ins, concrete work, asphalt work, or surface restoration coordination.
Restaurant openings may require coordination among landlord, design team, municipality, County requirements, plumbing review, and inspections.
Cleanout, pump-out, sampling, lid location, truck access, and operational responsibilities should be considered before construction starts.
Common Paths
A new restaurant tenant may need grease trap sizing support, utility investigation, installation planning, permit coordination, and field execution. Genesis can help the owner understand whether the proposed kitchen appears aligned with the available plumbing conditions and what construction impacts may follow.
A former restaurant space is not automatically ready for the next operator. The existing grease interceptor may not match the new concept, fixture count, kitchen layout, condition, access needs, or regulatory path. A focused existing-system evaluation can reduce uncertainty before the tenant signs or starts demolition.
Frequent backups, odors, maintenance problems, inaccessible lids, cracked tanks, or repeated compliance concerns can point toward repair, operational changes, or full grease interceptor replacement. Genesis separates field observations from assumptions so the owner can make a practical decision.
Who Should Be Involved
The owner or tenant should provide the business concept, menu, seating, expected volume, and schedule pressure. The landlord or property manager may have records for prior tenants, utility locations, service areas, and building restrictions. The design team can confirm fixture schedules and drawings. Genesis can review constructability, installation sequencing, replacement exposure, and the practical field path.
That coordination is especially important in second-generation spaces. A prior restaurant use may reduce some uncertainty, but it can also hide assumptions. The previous operator may have had different hours, fixtures, food type, pump frequency, or agency history. Genesis tries to turn those unknowns into review items before the project reaches permitting, demolition, or opening-week pressure.
Planning A Restaurant Project?